D · DESTINATION
E · TRACE
Explore the TRACE moves.
05 /
How does it fit my situation?
Choose a named move in this branch to open its working page and checks.
- True Construct
Name the real underlying quality your metrics are supposed to represent, the thing that would still matter if no score existed.
- Result Signal
Pick a lagging observation close to the real outcome that would prove the value actually changed.
- Advance Signal
Choose an early, controllable indicator that should move before the final result does.
- Counter-Signal
Add a measure that catches the most likely way to improve the main number while destroying its value.
- External Reality Check
Include an observation you cannot easily manufacture, so self-deception gets exposed.